Kompatibilita batérií GoodWe
Battery Compatibility Overview
2) High-voltage Energy Storage Systems
| BatteryBrand | BatterySeries | BatteryModel | Inverter Series | ||||||
| ET (5-10kW)* | EH** | BT | BH | EHB | ET (15-30kW) | ET G2 | |||
| GOODWE | Lynx Home F*1 Lynx Home F PLUS+*2 |
LX F6.6-H | ● | ● | ● | ● | ● | ● | ● |
| LX F9.8-H | ● | ● | ● | ● | ● | ● | ● | ||
| LX F13.1-H | ● | ● | ● | ● | ● | ● | ● | ||
| LX F16.4-H | ● | ● | ● | ● | |||||
| Lynx Home F G2*3 | LX F6.4-H-20 | ● | ● | ● | |||||
| LX F9.6-H-20 | ● | ● | ● | ● | ● | ● | ● | ||
| LX F12.8-H-20 | ● | ● | ● | ● | ● | ● | ● | ||
| LX F16.0-H-20 | ● | ● | ● | ● | ● | ● | ● | ||
| LX F19.2-H-20 | ● | ● | ● | ● | ● | ● | ● | ||
| LX F22.4-H-20 | ● | ● | ● | ● | ● | ● | ● | ||
| LX F25.6-H-20 | ● | ● | ● | ● | |||||
| LX F28.8-H-20 | ● | ● | |||||||
| Lynx C*4 | GW60KWH-D-10 | ● | |||||||
| Lynx D*5 | LXD5.0-10 | ● | ● | ● | ● | ● | ● | ||
| Lynx D G2*9 | GW5.1-BAT-D-G20 | ● | ● | ||||||
| GW5.1-BAT-D-G21 | ● | ● | |||||||
| GW8.3-BAT-D-G20 | ● | ● | |||||||
| GW8.3-BAT-D-G21 | ● | ● | |||||||
| GW6.0-BAT-D-G20 | ● | ● | |||||||
| GW9.0-BAT-D-G20 | ● | ● | |||||||
| BAT*6 | GW61.4-BAT-AC-G10 | ● | |||||||
| GW102.4-BAT-AC-G10 | ● | ||||||||
| GW112.6-BAT-AC-G10 | ● | ||||||||
*. Including ET Series: ET PLUS+, ET PLUS+ (16A)
**. Including EH Series :EH PLUS
ET/EH/BT/BH/EHB:
*1. ARM firmware versions 19 and above are required for compatibility.
*2. ARM firmware versions 23 and above are required for compatibility.
*3. For compatibility, the ET/BT series requires ARM25 and DSP09 versions and above; the EHB series requires ARM25 and DSP version 03 and above; the EH/BH series
requires ARM25 and DSP version 07 and above.
*5. For compatibility, the ET/BT series requires ARM28 and DSP version 12 and above.
*5. For compatibility, the EH/BH series requires ARM29 and DSP version 08 and above.
*8. The EHB series requires firmware version ARM32/DSP 02 or higher to be compatible with the LX F22.4-H-20 model.
*8. The EH/BH series requires firmware version ARM 32/DSP 10 or higher to be compatible with the LX F22.4-H-20.
ET (15-30kW)/ET G2/ET(40-50kW):
*3. For compatibility, the ET (15-30kW) Series requires ARM07 and DSP version 06 and above.
*4. For compatibility, the ET (15-30kW) series requires ARM07 and above.
*5. For compatibility, the ET (15-30kW) series requires ARM 09 and DSP version 08 and above.
*3. ET (15-30kW) matching Lynx Home F G2 Series LX F9.6-H-20 requires ARM09 and DSP08 and above.
*7. Lynx Home F G2 Series LX F6.4-H-20 only supports GW12KL-ET and GW18KL-ET models in the ET (15-30kW) series.
*6. For compatibility, the ET (15-30kW) series requires ARM13 and above.
*9.For compatibility, the ET (15-30kW) series requires ARM 18 and DSP 14 and above.
*9.For compatibility, the ET G2 series requires ARM 18 and DSP 06 and above.
3) Commercial and Industrial Energy Storage Systems
| BatteryBrand | BatterySeries | BatteryModel | Inverter Series | ||||
| ETC | BTC | ET(40-50kW) | ET (80-100kW) | ETR 80-125kW | |||
| GOODWE | Lynx C*1 | GW60KWH-D-10 | |||||
| GW100KWH-D-10 | ● | ||||||
| GW100KWH-D-10 (Extension) |
● | ||||||
| LX C 101-10*2 | ● | ● | ● | ||||
| LX C 120-10*2 | ● | ● | ● | ||||
| LX C 138-10 | ● | ● | ● | ||||
| LX C 156-10 | ● | ● | ● | ||||
| BAT*3 | GW61.4-BAT-AC-G10 | ● | ● | ||||
| GW102.4-BAT-AC-G10 | ● | ● | |||||
| GW112.6-BAT-AC-G10 | ● | ● | |||||
| GW208.9-BAT-LC-G10 | ● | ||||||
| GW261.2-BAT-LCD-G10 | ● | ||||||
*. Including ET Series: ET PLUS+, ET PLUS+ (16A)
**.Including EH Series :EH PLUS
ET/EH/BT/BH/EHB:
*1. ARM firmware versions 07 and above are required for compatibility.
*2. ARM firmware versions 11 and above are required for compatibility.
ET15-30kW:
*2. ARM firmware versions 02 and above are required for compatibility.
BYD CAN communication line PIN1/2 corresponds to inverter CAN communication line PIN4/5.
*2.The maximum charge/discharge current of single-cluster HVS battery is 25A, ET30kW with single-cluster HVS battery will not be able to reach the nominal maximum
charge/discharge power of the inverter.ET15-30 series with HVM battery maximum charging and discharging current of 40A.
*2. BYD HVM 11.0 is used with ET15-30kW inverters, inverter version must be ARM 09/DSP08 or above.
BYD battery multi-tower parallel explanation:
*4. For HVM+ multi-tower system parallel connections, the BYD 70A combiner box is required.
*5. For HVB multi-tower system parallel connections, the BYD 70A combiner box is required.
*6. For HVS+ multi-tower system parallel connections, the BYD 70A combiner box is required.